A rooftop AOV smoke vent open and discharging smoke clear of the building during a live test

AOV & Smoke Control

AOV and smoke ventilation systems, explained and installed.

Book a free consultation

Automatic vents that clear smoke from a stairwell or car park, designed and installed to BS 9991.

An AOV, or automatic opening vent, is a roof or wall vent that opens on its own the moment a fire alarm signal reaches it, usually within seconds. Once open it lets smoke and heat escape upward and outward instead of filling the stairwell or corridor people need to use to get out. It is not there to put the fire out, it is there to keep the exit route usable while people leave.

Any residential block with a single common stair, which covers most UK apartment buildings, has no second way out if that stair fills with smoke. Approved Document B and BS 9991 both require a mechanism to keep the stair and its lobbies clear, and for most single-stair blocks that is a smoke ventilation system built around one or more AOVs. Under the Regulatory Reform (Fire Safety) Order 2005, the responsible person for the building has to keep it maintained, tested and documented, not just installed once.

The equipment

AOV rooftop ventLouvred or polycarbonate dome, sized to a calculated free area rather than an off-the-shelf size.
Smoke dampersOpen on the fire floor, stay shut elsewhere, so smoke draws from one floor at a time.
LouvresWall-mounted alternative to a roof vent, used for car parks and plant areas.
Smoke shafts and risersFire-rated duct to the rooftop vent; natural systems rely on its buoyancy, so sizing and position matter.
ActuatorsChain or linear motors that physically open a vent or damper, wired back to the panel.
Control panels and detectionDecide which vents and dampers open and in what sequence, and flag a fault if one fails.
Break glass overrideLets the fire service open the vents by hand on arrival, regardless of automatic detection.
Weather sensorsWhere fitted, balance smoke clearance against wind and rain; never override a genuine fire signal.
Automatic opening vent at the head of a stairwell
01 / 03

An AOV opens on its own when smoke is detected, keeping the stair clear enough to escape and for crews to get in.

AOV, damper or louvre

An AOV is the vent itself, the opening smoke passes through to leave the building. A smoke damper is a valve inside the ductwork that decides where the smoke is drawn from, open on the fire floor and shut everywhere else. A louvre is a fixed or motorised grille set into a wall, used where venting through a wall suits better than venting through the roof. When someone reports "the AOV isn't working" the actual fault is just as likely to be a stuck damper or a jammed louvre actuator, so a proper service checks the whole chain.

Natural or mechanical

SystemHow it works
NaturalHot smoke rises through a shaft under its own buoyancy, no fan. Fewer moving parts, suits most low and mid-rise blocks with a straightforward stair.
MechanicalFans pull smoke out where a natural shaft cannot be built large or straight enough: taller blocks, deep-plan buildings, basement car parks. More equipment, more to maintain.
Car parksEnclosed and underground car parks trap vehicle fire smoke with no natural escape route, so these usually run on jet fans or ducted mechanical extract, sized separately from the residential system above.
Smoke damper grille set into a corridor wall
02 / 03

A damper sits in the ductwork, a louvre in the facade and an AOV in the roof or window. Each does a different job.

Standards and legal duty

BS 9991Sets when a smoke control system is required, by the building's height, storeys and stair arrangement.
Approved Document BBuilding Regulations fire safety, works alongside BS 9991 for means of escape.
EN 12101-2Standard for natural smoke and heat exhaust ventilators, what the rooftop AOV vent itself has to meet.
EN 12101-3Standard for powered smoke and heat exhaust ventilators, for fan-driven mechanical systems.
RRO 2005Responsible person's duty to keep the system maintained, tested and recorded, not just installed once.

A vent or fan without the right EN 12101 certification should not go into a life-safety smoke control system, whatever else it looks like on paper.

Smoke control panel and fire fighter override switch by an entrance
03 / 03

The control panel and fire fighter switch sit where crews expect them, as the standards and Building Regulations require.

What we do

We design the smoke ventilation strategy against BS 9991, then supply, install, commission and maintain the shaft, vents, dampers, detection and control panel as one coordinated scheme, all in-house. We work with equipment from SE Controls and other established manufacturers, matched to the building rather than one fixed product line. For an existing system with no clear history we run a takeover survey and bring it up to standard before it moves onto a maintenance contract.

We cover apartment blocks, mixed-use developments, student accommodation, HMOs, offices and car parks, national from our West Midlands base, with a core area under the areas we cover. Ongoing compliance runs under planned AOV servicing and testing, with every visit logged. Where a building also needs detection and alarm work, we design and install fire alarm and detection systems as one coordinated, commissioned scheme alongside the smoke control.

Start with the stair. The system follows from how the building escapes.

Designed, installed, commissioned and serviced by the same in-house team.

  • EN 12101Vent standardParts 2 and 3, natural and powered
  • WeeklyFunction checkPlus planned servicing
  • AnnualInspectionLogged for the responsible person
Free phone consultation

Tell us about the building.

Five quick questions, about a minute. We read every brief and aim to call you back within one working day, no obligation. Rather talk now? Call 01922 660923.

1 of 5System

What do you need help with?

Pick the main one. You can mention the rest later.

What kind of building is it?

This tells us which standards apply.

Where are you at?

No wrong answer, it just helps us come prepared.

Where is it, and anything we should know?

Both optional. A town is plenty.

Where should we call you back?

We only use your details to reply to this enquiry. We never share them.

FAQ

What responsible persons ask us.

Does my building legally need an AOV?

If it is a residential building with a single common stair and no second means of escape, in most cases yes. Approved Document B and BS 9991 require smoke control on that kind of stair arrangement. If a system was already installed when the building was signed off, you are required to keep it maintained and tested, whether or not it was your decision to fit it originally.

What is the difference between a natural and a mechanical AOV system?

A natural system relies on hot smoke rising through a shaft and out of a roof vent with no fan involved. A mechanical system uses fans to pull the smoke out, and is used where the building's layout, height or car park geometry means a natural shaft cannot clear the smoke on its own.

How often does an AOV system need testing?

Weekly function checks on the vents and control panel, a full service at least twice a year, and a formal annual inspection. We can carry out the weekly checks and handle the full service and inspection schedule, so the paperwork is always current.

Can you take over a system another contractor installed?

Yes. We inspect the shaft, vents, dampers, wiring and panel against current standards, log any defects, carry out remedial work to bring it up to a compliant standard, and put it onto a planned service contract from there.

Is an AOV the same as a fire alarm?

No. A fire alarm detects the fire and alerts people. An AOV clears smoke from the escape route once the alarm has triggered it. They are separate systems that work together, and we design and install both so they are commissioned as one coordinated scheme.

Can a car park have smoke ventilation added if it doesn't have any?

Yes, most enclosed and underground car parks can be retrofitted with mechanical extract. We survey the layout, size the system to the volume of the car park, and install ducted or jet fan extraction designed for that specific space.